Veterinary Diagnostic Laboratory




New Diagnostic Medical Center Spring Update- 03/21/08

The new Diagnostic Medicine Center is a 3 story, 90,000 square foot building that is scheduled for completion in December of 2009. It will house the Veterinary Diagnostic Laboratory, Clinical Pathology, CSU Extension Veterinarian and APHI Laboratory. It will attach to the north side of the James Voss Teaching Hospital.

Dr Barbara Powers (right) viewing the construction progress with Bernie and Grace from GHPhipps the General Contractor.

Getting ready for the the first half of the 2nd floor concrete. It will be 13" thick and this section will require over 360 yards of concrete.
Looking west into the building from the necropsy area. Lab space and sample entry is on the left and offices on the right.